Sauce Labs Critical Service Maintenance: Saturday, August 25th
Scheduled Maintenance Report for Sauce Labs Inc
Completed
The maintenance has completed successfully. All systems are fully operational.
Posted 4 months ago. Aug 25, 2018 - 11:33 PDT
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted 4 months ago. Aug 25, 2018 - 08:00 PDT
Scheduled
Sauce Labs will be conducting critical network infrastructure improvements in our Santa Clara data center this Saturday, starting at 8:00am PDT and ending at 12:00pm PDT. This maintenance window was originally scheduled for later in the year. However, because of higher than expected usage of our service, the maintenance has become critical. In addition to preventing potential downtime, these infrastructure improvements will increase our visibility into traffic and better equip our service for future scalability.

During this critical maintenance window, portions of the service (including running automated and manual tests) to be unavailable for up to four hours.
Posted 4 months ago. Aug 22, 2018 - 18:15 PDT
This scheduled maintenance affected: Automated VM Testing (Automated PC Testing, Automated Mac Testing, Automated iOS Simulator Testing, Automated Android Emulator Testing), REST API (REST API VMs, REST API RDC), Manual Testing (Manual VM Testing, Manual RDC Testing), Automated RDC Testing (Automated RDC Testing, EU Data Center, Automated RDC Testing, US Data Center), Web Interface (Sauce UI, Real Device Cloud UI, Analytics, saucelabs.com, Documentation Wiki), and Sauce Connect (Sauce Connect VM, Sauce Connect RDC).